We recently installed this 100kva hushpower canopied generator as an automatic mains failure system for a scientific research facility. We supplied the machine with battery charger and block heater, it was fully load tested and serviced before being painted prior to delivery. A 150A DSE controlled changeover panel monitors the incoming mains supply and will start the generator on low phase-phase voltage, low phase-neutral voltage or a total supply failure. The entire building including low temperature freezers, IT servers and biomass heating plant will be supplied by the generator in the event of a loss of supply. All the cabling and containment including changeover panel were installed with little or no inconvenience to our client who were already using the building, finally the install was commissioned at an agreed time, on time.